| Klondike Renovations Phase 1Job Contact:
Job Images

9/24/2009
anchor bolts in place

9/24/2009
early concrete placement

9/24/2009
excavation of existing soils

9/24/2009
finishing off

9/24/2009
klondike transformer

9/24/2009
main floor system

9/24/2009
nearing sub base height

9/24/2009
receive reinforcing steel

9/24/2009
spread footings in place

9/24/2009
sub grade and batter boards

9/24/2009
waterproofing

9/24/2009
anchor bolt layout

10/20/2009
first 5 feet lift hard corridor

10/20/2009
hard corridor walls in place

10/20/2009
hard corridor walls nearing top out

10/20/2009
perlins added

10/20/2009
steel structural starting

10/20/2009
structural continues

11/11/2009
framing going up

11/11/2009
corridor lid reinforcement

11/11/2009

12/4/2009
awning at wood-metal shop

12/4/2009
ready for brick after weather

12/4/2009
windows in place

12/4/2009

1/25/2010
Continue Masonry

1/25/2010
Shop Interior

1/25/2010
Entry to Shops

1/25/2010
Single Ply Roofing

1/25/2010
Roofing Transitions

1/25/2010
Covered Shop Entry

1/25/2010
Masonry Progression

1/25/2010
Interior Shop Area

1/25/2010
Ready for finishes at Shops

1/25/2010
Electrical circuit runs

1/25/2010

3/18/2010
old shop to new library area.

3/18/2010
exterior site and building

3/18/2010
overhead shop doors

3/18/2010
new shop area

4/2/2010

4/2/2010
library roof

4/2/2010
library roof

4/2/2010
library roof

4/2/2010
library roof

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/30/2010
shop handwash area

4/30/2010
classroom finishes

4/30/2010
metal shop welding station
|
|
|