| Kelton High School Classroom AdditionJob Contact:
Downloadable DocumentsAddendum 01 Addendum 2 ARCH Plans Document Directory MEP Plans Revised MPE Set SD-18 Specs
Job Images

5/15/2009

6/2/2009
starting excavation of existing soils

6/22/2009
four lifts remaining

6/22/2009
raising sub base

6/26/2009
nearing grade

6/26/2009
two lifts remaining

7/10/2009
site work is complete to grade

7/23/2009

8/3/2009
foundation at round wall

8/7/2009
freezer-cooler

8/31/2009
reinforcing placement

8/31/2009
round wall footing placement

8/31/2009
interior footings in place

9/2/2009
masonry beginning

9/2/2009
elevator pit

9/9/2009
elevator pit reinforcement

9/9/2009
round wall and grout cells

9/9/2009

9/9/2009

9/16/2009
existing aerial electrical

9/16/2009
starting excavation of existing soils

9/25/2009
bladder from inside

9/25/2009
full inflation

9/25/2009
installing bladder

9/25/2009
partial inflation

10/12/2009
concrete at walkway gang toilet

10/12/2009
at existing elementary

10/19/2009
framing at walkway

10/19/2009
interior of dome building

10/26/2009
interior stairs to 2nd floor

10/26/2009
new fence posts in place

11/2/2009
dome interior during construction

11/2/2009
forms started at standard construction

11/9/2009
bar joists at walkway

11/9/2009
covered walkway structural

11/30/2009
covered walkway taking shape

11/30/2009
permanent fencing

12/4/2009
new fencing in place

12/4/2009
elevator pit

1/25/2010
Walkway Exterior

1/25/2010
Curved Entry Awning

1/25/2010
Corridor Framing

1/25/2010
1st Floor Set Up for Concrete

1/25/2010
Concrete 1st Floor

1/25/2010
Interior Framing

1/25/2010
Covered Walkway

3/18/2010

3/18/2010

3/18/2010

3/18/2010

3/18/2010

3/18/2010

3/18/2010

3/18/2010

3/18/2010

3/18/2010

3/18/2010

3/22/2010
Bus Drive

3/22/2010
Transformer location

3/22/2010
Science Fume Hood

3/22/2010
Building Exterior

3/22/2010
Chemical Storage

3/25/2010
Science Casework

3/25/2010
Science cabinets

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/23/2010

4/28/2010

4/28/2010

4/28/2010

6/2/2010
interior 2nd floor commons

6/2/2010
exterior progress

6/17/2010

6/17/2010

6/17/2010
|
|
|