Hale Center ISD Bond Improvements

RELATED LINKS
Out for Bid DocumentsUnder Construction

Job Contact:

Downloadable Documents

07027 Final Specs PDF Hale Center

07027 Hale Center Addendum 2

07027 Hale Center Addendum 3

07027 Hale Center Final Arch

07027 Hale Center Final Elec

07027 Hale Center Final Mech

07027 Hale Center Final Plumbing

07027 Hale Center ISD Addendum 4

07027 Hale Center ISD Addendum1

07027 Hale Center ISD Supp Instruction 1

Hale Center Drawing Directory

Hale Center ISD SD 43

Hale Center ISD SD-24-26.pdf

Hale Center ISD SD-28-42.pdf

Hale Center Soils Investigation Report

Hale Center Structural Clarification

Hale Center Supp. Instruc. Base Plate

Hale Center Supp. Instruction 02

Plan Holder list

Pre bid sign in sheet



Job Images


1/8/2009
Excavate Building Area

1/22/2009
Excavate Building Area

1/22/2009
Replace and Compact

1/22/2009
Compaction Second Lift

2/19/2009
Start Tying Reinforcing Steel

2/20/2009
Waste Line Installation

2/20/2009
Proper Shoring for Trench Work

2/20/2009
CMU Block Delivery

3/3/2009
underground rough in

3/3/2009
waste line installation

3/5/2009
west side of new high school

3/12/2009
cut for circular drive

3/12/2009
plumbing rough in

3/18/2009
starting up at hard corridor

3/18/2009
underground plumbing and form work

3/25/2009
placing hard corridor slab

3/25/2009
concrete activity

3/31/2009
concrete placement

3/31/2009
floor at area a

4/8/2009
area a concrete in place

4/8/2009
area b nearly ready to place

4/8/2009
aerial

4/16/2009
area a and b concrete

4/16/2009
plumbing piping in place

4/24/2009
area a

4/24/2009
hard corridor

4/24/2009
main entry junction

4/29/2009
start steel erection

4/29/2009
hard corridor nearing top out

5/21/2009
area b to main hub

5/21/2009
section with hard corridor

5/29/2009
bar joists and decking

5/29/2009
underground electrical run

5/29/2009
hollow metal delivery

6/26/2009
metal at ag shop in background

6/26/2009
Metal Building Gym Progress

7/10/2009
metal framing progress

7/10/2009
main entrance photo

8/27/2009
gym

8/27/2009
main entrance

9/2/2009
metal wall framing

9/18/2009
framing continues at hard corridor

9/18/2009
main entrance canopy

9/18/2009
agriculture building

9/24/2009
framing in place

9/24/2009
interior framing and ducts

9/24/2009
decking and rtu framing

9/30/2009
exterior wall framing nearing completion

9/30/2009
metal stud forest

10/20/2009
wall sheeting starting

10/20/2009
exterior framing in place

10/20/2009
roofing starting

11/11/2009
main entry

11/11/2009
exterior gypsum sheathing

11/11/2009
efis insulation board

12/4/2009
efis work beginning

12/4/2009
Main Entry Progress

12/17/2009
Back of Building

12/17/2009
Perforated Decking

12/17/2009
Inside Electrical Switchgear

12/17/2009
Interior Corridor

12/17/2009
EFIS at Exterior Main Entry

12/17/2009
EFIS Crew

1/19/2010
EFIS Finish

1/19/2010
Interior Progress

1/19/2010
Roof Top HVAC in place

1/19/2010
Roofing Nearing Completion

1/19/2010
AG Building Progress

3/18/2010

3/18/2010

4/8/2010
drops for fire sprinkler system

4/8/2010
progress on ceramic tile

4/21/2010
building exterior at main entry

5/19/2010
science lab progress

5/19/2010
gym bleacher seating area.

5/19/2010
scoreboard in place

5/19/2010
acoustical panels in place

5/19/2010
Wall lockers

5/19/2010
fume hood and eyewash at science lab.

6/17/2010

7/29/2010

7/29/2010

7/29/2010

7/29/2010

7/29/2010

7/29/2010

7/29/2010

7/29/2010

8/3/2010

8/3/2010

8/3/2010

8/3/2010

8/3/2010

8/3/2010

8/3/2010